通信,拉近世界的距离!
您的位置:首页 >资讯 >业界新闻 >查看资讯

SpaceX首捕星舰上级获突破,亚马逊Leo损失40颗卫星

移动通信网 程然

刚刚过去的周末,全球商业航天领域上演了戏剧性的一幕。SpaceX星舰(Starship)计划取得历史性突破——首次成功回收上级"Ship"飞船,向快速复用迈出关键一步;而就在一天之后,亚马逊Leo(原Kuiper) constellation 却遭遇重挫:ULA新一代火箭Vulcan的首飞任务在升空约十分钟后发生"异常",40颗卫星全部损失,其2026年内启动初期商用服务的计划面临变数。

历史性一捕:星舰复用之路打通最难一环

11月14日,SpaceX执行星舰第15次飞行任务,在部署26颗大容量Starlink V3卫星并完成近一天的在轨飞行后,171英尺长的上级Ship离轨返回,精确导航至得州Starbase基地,于美东时间下午4时20分缓缓落入发射塔"Mechazilla"的机械臂中。这是星舰上级的首次成功回收,尽管原定的"双捕"目标未能完全实现——一级Super Heavy V3助推器因发动机推力不足导致塔架回收中止,转而在墨西哥湾完成海上着陆。

马斯克在X平台解释称,放弃助推器塔架捕获的原因是"燃料略有不足"。分析机构ISI Evercore分析师Kutgun Maral在研究报告中指出,此次Ship捕获是"复用的前提条件,也是通往该目标最清晰的一步"。他强调,星舰第15次飞行首次提供了硬证据,证明复用难度更高的上半部分——能够从轨道再入大气层并成功被捕获。值得注意的是,此次捕获是首次尝试即告成功,而马斯克9月给出的成功概率仅为50%至60%。

New Street Research的分析师团队则更为乐观,认为"复用的主要障碍已经跨越"。SpaceX接下来将对回收飞船的发动机和隔热罩进行检查,以优化后续星舰设计。当前的核心任务是将翻新周期从数周压缩至数天,最终目标是缩短至数小时。

【关键数据】

- Ship上级长度: 171英尺(约52米)

- Starlink V3累计部署: 52颗(SpaceX称需数百颗才能显著提升速率)

- 亚马逊Leo损失卫星: 40颗

- Vulcan合同: 38次发射,承载近1500颗卫星,约占规划星座一半

- Vulcan飞行记录: 5次飞行3次异常(原定2019年首飞,实际2024年1月 debut)

Vulcan首飞失利:亚马逊Leo商用计划承压

与SpaceX的高光时刻形成鲜明对比,11月15日执行的Vulcan Leo 1任务成为亚马逊Leo的噩梦。这是Vulcan火箭执行的第一个亚马逊Leo专属任务(此前部署均由ULA上一代Atlas V完成),也是双方38次发射合同的首飞。火箭升空约十分钟后出现异常,40颗卫星随之损失。ULA尚未确定故障根本原因,仅表示"将与美国客户及相关机构密切合作,查明原因、确定纠正措施,并尽快复飞"。

此次失利对亚马逊Leo的打击不容小觑。该星座目前运行着接近400颗低轨卫星,数千台客户终端已准备就绪,原计划年内启动初期商用服务,并曾在7月前将星座扩展至700颗的目标。今年6月,FCC已批准其部署目标前半部分延长24个月的申请。New Street分析师指出,尽管拥有六十年发射经验,ULA"仍在艰难爬升一款新型一次性火箭的产能",Vulcan五次飞行中已出现三次异常。此次失败距离蓝色起源New Glenn火箭在预发射测试中爆炸仅过去约六个月——那枚火箭原计划为亚马逊Leo部署48颗卫星。

发射运力短缺:SpaceX主导地位进一步强化

Vulcan的问题放大了行业对替代发射运力的迫切需求。New Street分析师直言,周日的失败"只会进一步强化SpaceX的主导地位,以及随之而来的监管压力"。多家初创企业试图扩充运力以缓解发射瓶颈,但全行业的延期表明新运力上线速度将慢于预期。拥有可靠飞行记录的SpaceX和Rocket Lab最有条件提供增量运力。TMF Associates分析师Tim Farrar则提出更尖锐的问题:SpaceX是否会以"善意的霸主"姿态行事,还是将利用其主导地位挤压竞争 constellation——包括商业和政府背景的对手。

与此同时,SpaceX正在推进Starlink V3卫星的规模化部署,并为后续V4卫星以及"Starmind"AI卫星星座铺路。公司总裁兼COO Gwynne Shotwell近期表示,需要部署"几百颗"V3卫星,用户才能真正感受到速率的显著提升,这一目标有望在2027年年中实现。而随着星舰复用能力逐步成熟,SpaceX还计划逐步退役Falcon 9,将主力转向星舰。从长期看,星舰快速复用一旦实现,将支撑宽带卫星与AI卫星的大规模部署,以及未来的月球和火星任务——这也是马斯克火星愿景得以落地的基础。


出处:SpaceX's Starship program advances as Amazon Leo suffers another setback

英文原文
Informa TechTarget | Telecoms Channel Dive TechTarget Infrastructure Explore our brands An Informa TechTarget Publication Leading Lights Awards Network X Webinars Partner with us Newsletter Sign-Up Newsletter Sign-Up Network Tech Related Topics Optical Networking Broadband Semiconductors Cable Technology Routing & Switching SDN Recent in Network Tech See all Satellite SpaceX's Starship program advances as Amazon Leo suffers another setback SpaceX's Starship program advances as Amazon Leo suffers another setback by Jeff Baumgartner Nov 16, 2026 6 Min Read Cable Technology Optimum delays $102.5M in interest payments as it pursues new debt deal Optimum delays $102.5M in interest payments as it pursues new debt deal by Jeff Baumgartner Nov 16, 2026 3 Min Read Wireless Related Topics 5G Mobile Core 6G Open RAN Satellite Smartphones & Devices 2G/3G/4G Private Networks IOT Recent in Wireless See all Satellite SpaceX's Starship program advances as Amazon Leo suffers another setback SpaceX's Starship program advances as Amazon Leo suffers another setback by Jeff Baumgartner Nov 16, 2026 6 Min Read Cable Technology Optimum delays $102.5M in interest payments as it pursues new debt deal Optimum delays $102.5M in interest payments as it pursues new debt deal by Jeff Baumgartner Nov 16, 2026 3 Min Read Software Related Topics OSS/BSS/CX Network Platforms Recent in Software See All Digital Transformation TIM to expand its services through synergies with Poste – CEO TIM to expand its services through synergies with Poste – CEO by Tereza Krásová Nov 12, 2026 3 Min Read OSS/BSS/CX Jio eyes global telcos with managed services model Jio eyes global telcos with managed services model by Gagandeep Kaur Nov 9, 2026 3 Min Read IT Infrastructure Related Topics Data Centers The Edge Network Recent in IT Infrastructure See all AI & Machine Learning Eurobites: Nokia and friends plan 'Northern' AI gigafactory Eurobites: Nokia and friends plan 'Northern' AI gigafactory by Paul Rainford Nov 16, 2026 2 Min Read Data Centers SKT powers up AI data centers with Hyosung SKT powers up AI data centers with Hyosung by Gigi Onag Nov 16, 2026 2 Min Read Digital Transformation Related Topics AI & Machine Learning Network Automation Security Cloud Virtualization Customer Experience Recent in Digital Transformation See all AI & Machine Learning Eurobites: Nokia and friends plan 'Northern' AI gigafactory Eurobites: Nokia and friends plan 'Northern' AI gigafactory by Paul Rainford Nov 16, 2026 2 Min Read Data Centers SKT powers up AI data centers with Hyosung SKT powers up AI data centers with Hyosung by Gigi Onag Nov 16, 2026 2 Min Read Business Related Topics Operations Business Transformation Regulatory & Politics Sustainability Diversity & Inclusion Finance Asia Recent in Business See all Cable Technology Optimum delays $102.5M in interest payments as it pursues new debt deal Optimum delays $102.5M in interest payments as it pursues new debt deal by Jeff Baumgartner Nov 16, 2026 3 Min Read AI & Machine Learning Eurobites: Nokia and friends plan 'Northern' AI gigafactory Eurobites: Nokia and friends plan 'Northern' AI gigafactory by Paul Rainford Nov 16, 2026 2 Min Read Services Related Topics Video Broadcast Video Streaming CDN SD-WAN Recent in Services See all Cable Technology Midco details CEO transition Midco details CEO transition Oct 27, 2026 1 Min Read AI & Machine Learning HPE claims to have beaten Cisco to a proper self-driving network HPE claims to have beaten Cisco to a proper self-driving network by Iain Morris Oct 27, 2026 6 Min Read More Related Topics Newsletters Webinars Leading Lights Awards White Papers Videos Podcasts Symposiums Omdia Telecoms Research About us Meet the Light Reading Team Light Reading Resource Library Satellite Broadband Network Technology News SpaceX's Starship program advances as Amazon Leo suffers another setback SpaceX nailed its first-ever upper-stage Starship catch, a key reusability milestone. Meanwhile, Amazon Leo lost 40 satellites as ULA's Vulcan rocket suffered an in-flight 'anomaly,' raising fresh concerns about near-term satellite launch capacity. Jeff Baumgartner , Senior Editor , Light Reading November 16, 2026 6 Min Read 'Mechazilla,' SpaceX's launch and landing tower platform, catches the upper-stage 'Ship" rocket on November 14, 2026 (Source: Screengrab from SpaceX live feed on November 14, 2026) It was a big weekend of ups and downs for the burgeoning space economy. While SpaceX's Starship program took a big step toward rapid reusability, Amazon Leo's plan to launch initial commercial services in 2026 could be in jeopardy after a batch of 40 satellites were lost when the inaugural launch of ULA's Vulcan rocket for Amazon Leo suffered an "anomaly" about ten minutes after liftoff. 'Baby Come Back' While SpaceX did not achieve the targeted "double catch" that would have returned Starship's lower-stage booster and upper-stage "Ship" safely back to Earth, it did retrieve the upper-stage successfully for the first time ever on Saturday. After deploying another 26 high-capacity "V3" Starlink satellites and spending nearly a day in orbit, the 171-foot Ship portion deorbited, navigated its way to a tower at Starbase in Texas and then gently maneuvered itself into the awaiting arms of "Mechazilla" (SpaceX's launch and landing tower platform) at 4:20 p.m. ET. Related: Starship reaches orbit, releases 26 high-capacity 'V3' Starlink satellites SpaceX captured the event as Player's " Baby Come Back " yacht rock anthem played in the background: View post on X The mission fell short of a goal to also catch Starship's first-stage "Super Heavy" V3 booster. The tower catch of the booster was aborted after computer systems determined it was out of position due to engine underperformance. It instead completed a landing burn in the Gulf of Mexico. Elon Musk added on X that the decision to ditch the booster in the ocean was because it was "slightly low on fuel." Step toward rapid reusability But after the first-ever catch/recovery of Starship's upper-stage, SpaceX believes it has taken a big step toward rapid reusability, which would enable Starships to be launched and relaunched like airplanes. Achieving reusability would set the stage for massive deployments of both broadband and AI satellites and for future missions to the Moon and Mars. "We caught Starship. Now, everything changes," Dan Huot, SpaceX's communications manager, declared on Saturday's live stream. Analysts characterized the catch as a key accomplishment, but it remains unclear when SpaceX will be able to fulfill its bigger reusability goals. Saturday's Ship catch is a "prerequisite for reuse and the clearest step toward that aim," said ISI Evercore analyst Kutgun Maral in a research note, noting that the upper-stage of SpaceX's former workhorse, Falcon 9, was tossed away after each flight. "Flight 15 [of Starship] is the first hard evidence that the upper stage – the harder half of reuse – can survive reentry from orbit and be caught," he added. Related: Amazon Leo still tracking for 2026 service launch as satellite production ramps The analysts at New Street Research agreed in a research note (registration required) that the "major hurdles for reusability have passed. SpaceX will now inspect the ship's engines and heat shield to refine future Starship designs. The priority now is to cut refurbishment time from weeks to days and eventually to hours." ISI Evercore's Maral pointed out that the Ship catch came on the first attempt, after Musk gave it 50% to 60% odds of success in September. But Maral noted that risks remain and a "steady run of successful launches remains key." Starship's recent successes also bode well for the deployment of Starlink V3 satellites, future V4 satellites and the coming deployment of SpaceX's "Starmind" AI satellites. With Saturday's launch, Starlink has deployed 52 V3 birds. SpaceX President and COO Gwynne Shotwell recently suggested the company will need to deploy a "few hundred" V3 satellites for Starlink customers to "really feel the impact" in terms of improved speeds. She said that could be achieved by mid-2027. Amazon Leo loses 40 satellites The weekend did not go as well for Amazon Leo, which lost 40 satellites on Sunday when the UVA Vulcan Leo 1 mission "suffered an anomaly" about ten minutes into the flight. It was the first of a 38-launch contract to deploy Amazon Leo's constellation (prior launches were aboard ULA's older Atlas V rocket). Related: SpaceX eyes full Starship recovery as Starlink subs miss estimates Amazon Leo, which is operating just under 400 low-Earth orbit (LEO) satellites and has thousands of customer terminals ready to go, had planned to launch initial commercial services later this year. Previously, Amazon Leo had expected to expand its constellation to 700 satellites by July 2026. In June, the FCC approved Amazon's request for a 24-month extension on the first half of its deployment goal. ULA Vulcan rocket on pad prior to launch of the Vulcan Leo 1 mission (Source: Screengrab of ULA live stream on November 15, 2026) Amazon Leo has been asked if the timing of its 2026 service launch plan has changed after the loss of the satellites on Sunday. ULA has yet to determine the root cause of the issue but is analyzing the data. "We will work closely with our customer and other appropriate organizations to find the cause, determine the appropriate corrective action, and return to flight as quickly as possible," ULA explained on the mission site . In a seemingly prescient pre-recorded video ahead of Sunday's launch, Chris Ellerhorst, ULA's VP of strategy, business development and sales, warned that "all missions carry some level of risk. That's especially true for inaugural missions." Amazon Leo echoed as much in this X post following the failed mission: View post on X Sunday was a clear setback for Amazon Leo, which is counting on Vulcan to be a deployment workhorse and to accelerate the cadence of putting its satellites into service. Amazon Leo has contracted 38 flights on the platform to launch nearly 1,500 of its satellites – nearly half of its planned constellation. Despite six decades of launch heritage, ULA "is still struggling to ramp a new expendable rocket," New Street's analysts noted. "Originally slated to fly in 2019, Vulcan debuted in January 2024 and has suffered three anomalies in five flights." The Vulcan failure comes nearly six months after a Blue Origin heavy-duty "New Glenn" rocket exploded during a prelaunch test . That rocket was intended to launch and deploy 48 Amazon Leo satellites. Pressure for launch capacity builds ULA's issues with Vulcan amplify the need for alternative satellite launch capacity. Indeed, Sunday's failure only "increases SpaceX's dominance and the regulatory pressure that comes with it," New Street's analysts note. "A number of startups aim to ramp capacity to ease the launch bottleneck, but delays across the industry suggest that new capacity will come online more slowly than planned. Launch providers with a proven track record, such as SpaceX and Rocket Lab, are best positioned to add incremental capacity." Meanwhile, SpaceX is looking to wind down its Falcon 9 program as it plows ahead with Starship. In a post on X , TMF Associates analyst Tim Farrar wondered if SpaceX would use its dominance to serve as a "benevolent overlord or seek to put competing constellations (both commercial and defense) out of business? And what would be the political consequences? Feels like F9 could become a test case." He added that the "best PR move Musk could make right now would be to guarantee to make available sufficient Falcon 9 launches to third parties (50+ per year?) for as long as necessary." About the Author Jeff Baumgartner Senior Editor, Light Reading Jeff Baumgartner is a Senior Editor for Light Reading and is responsible for the day-to-day news coverage and analysis of the cable and video sectors. Follow him on X, LinkedIn and Bluesky . Baumgartner also served as Site Editor for Light Reading Cable from 2007-2013. In between his two stints at Light Reading, he led tech coverage for Multichannel News and was a regular contributor to Broadcasting + Cable. Baumgartner was named to the 2018 class of the Cable TV Pioneers. See more from Jeff Baumgartner Want more Light Reading stories in your Google search results? Add Us Now Subscribe and receive the latest news from the industry. Join 62,000+ members. Yes it's completely free. Sign me up Want more Light Reading stories in your Google search results? OFC Conference and Exhibition Experience OFC. Where the industry goes to learn, showcase technologies, forge partnerships and close deals. Registration is Open Popular whitepapers in 5G More whitepapers Sponsored Content Antenna Monitoring for Programmable Performance Antenna Monitoring for Programmable Performance Jan 12, 2026 Sponsored Content Antenna Beam Efficiency in Urban 4G/5G Networks Antenna Beam Efficiency in Urban 4G/5G Networks Nov 17, 2025 Our Latest Videos More videos Wi-Fi Wi-Fi 8, Edge AI and the Introduction of Security and Management services Wi-Fi 8, Edge AI and the Introduction of Security and Management services Cable Technology Harmonic CEO Charts a Pure-Play Broadband Future Harmonic CEO Charts a Pure-Play Broadband Future 5G Featured Story Rakuten Mobile's costs are spiking in post-KDDI race to add sites Japan's Rakuten is yet again having to build additional sites; this time, the end of its roaming deal with KDDI is to blame. More Discover more Leading Lights Awards Network X Research & Consulting Omdia Telecoms Research Asia Europe Partner with us About Us Meet the Light Reading Team Media Kit Digital Symposiums Sponsorship Specifications Join Us Newsletter Sign-Up Follow Us Copyright ? 2026 TechTarget, Inc. d/b/a Informa TechTarget. This website is owned and operated by Informa TechTarget, part of a global network that informs, influences and connects the world’s technology buyers and sellers. All copyright resides with them. Informa PLC’s registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. TechTarget, Inc.’s registered office is 275 Grove St. Newton, MA 02466. Home | CCPA: Do not sell my personal info | Cookies | Privacy | Terms Your Privacy Choices
微信扫描分享本文到朋友圈
扫码关注5G通信官方公众号,免费领取以下5G精品资料
5G通信公众号
  • 1、回复“YD5GAI”免费领取《中国移动:5G网络AI应用典型场景技术解决方案白皮书》
  • 2、回复“5G6G”免费领取《5G_6G毫米波测试技术白皮书-2022_03-21》
  • 3、回复“YD6G”免费领取《中国移动:6G至简无线接入网白皮书》
  • 4、回复“LTBPS”免费领取《《中国联通5G终端白皮书》》
  • 5、回复“ZGDX”免费领取《中国电信5GNTN技术白皮书》
  • 6、回复“TXSB”免费领取《通信设备安装工程施工工艺图解》
  • 7、回复“YDSL”免费领取《中国移动算力并网白皮书》
  • 8、回复“5GX3”免费领取《R1623501-g605G的系统架构1》
  • 本周热点本月热点
    通信人才网

    最热通信招聘

    更多